Cell
Single electrochemical unitIdentity, chemistry, electrical envelope and cell-level evidence
Battery knowledge · supply boundary
Use the correct product level in the RFQ so the quotation covers the hardware, interfaces, documents and project responsibilities you actually need.
General hierarchy
This is a general architecture, not a promise that every project uses all five labels. Ask the supplier to identify what is inside and outside the quoted boundary.
Identity, chemistry, electrical envelope and cell-level evidence
Topology, interconnects, insulation, sensing and mechanical retention
BMS boundary, protection, enclosure, terminals and external interfaces
DC aggregation, cabinet layout, protection, thermal and service access
Battery plus project-defined PCS, controls, safety, installation and grid/site interfaces
Responsibility checklist
Equipment selection and system delivery are separate questions. The quotation should state whether each item is included, supplied by another party or still open.
| System item | What to define | Status for an early RFQ |
|---|---|---|
| BMS | Monitoring, protection logic, contactor control and communication boundary | Supply responsibility to be confirmed |
| Electrical protection | Fuses, breakers, disconnects, grounding and coordination | Supply responsibility to be confirmed |
| Busbars / harnesses | Current path, insulation, connectors and service boundary | Supply responsibility to be confirmed |
| Rack / enclosure | Mechanical support, ingress, access and installation interface | Supply responsibility to be confirmed |
| PCS / inverter | DC/AC conversion, operating window and grid/load interface | Supply responsibility to be confirmed |
| EMS / controls | Dispatch, site controls, communications and supervisory logic | Supply responsibility to be confirmed |
| Thermal management | Heating, cooling, ventilation and derating strategy | Supply responsibility to be confirmed |
| Fire strategy | Detection, separation, suppression and site plan as applicable | Project-specific strategy and responsibility to be confirmed |
| Grid interface | Interconnection, protection, utility and market requirements | Project- and destination-specific responsibility to be confirmed |
| Installation | Transport, placement, cabling and site work | Supply responsibility to be confirmed |
| Commissioning | Functional checks, startup and responsibility handover | Supply responsibility to be confirmed |
| Testing / acceptance | Documents, witness points and acceptance criteria | Required evidence and responsible party to be confirmed |
Minimum RFQ inputs
Known inputs can be supplied now; open items can be marked Not yet defined.
General examples
These examples are hypothetical and contain no SES model, availability or quotation information.
System boundary FAQ
No. A rack or cabinet is one battery-system level. A complete BESS may also require PCS/inverter, controls, safety strategy, installation and site interfaces, all defined by project.
A BMS monitors and protects the battery boundary. A PCS converts power between the battery DC side and the AC system. Their interfaces and responsibility must be reviewed together.
Do not assume it from the equipment name. Installation, cabling, commissioning and acceptance responsibilities must be stated in the project scope and quotation.
State the required delivery level and known power, energy, site and interface conditions. Mark unresolved PCS, EMS, installation or evidence items as Not yet defined.
These references support project scoping and buyer education. They do not establish SES supply responsibility, product performance, certification or compliance.
Send the required delivery level, target kW/kWh, interfaces, location and the responsibilities already assigned.