Start with the operating objective, PV generation, site load, grid conditions and control boundary before choosing battery capacity or an ESS enclosure.

Decision framework

Use generation and load timing to define the storage job.

A nameplate PV rating and an annual electricity total are not enough. Compare time-based generation and consumption, then define grid, islanding and backup requirements.

Project objectiveInputs to defineSystem questions to close
Solar self-consumptionPV generation curve, export limit, load curve and charging window.Dispatch priority, usable energy and inverter/EMS controls
Peak managementInterval demand, target peak, event duration and tariff basis.Required kW, usable kWh, reserve and measurement method
Backup powerCritical-load panel, peak/start load, runtime and transfer expectation.Islanding capability, protection, restart and reserved energy
Off-grid operationSeasonal generation, daily load, autonomy, generator and recovery strategy.Energy balance, reserve, black start and load shedding
MicrogridSources, loads, control hierarchy, operating modes and transitions.PCS/EMS interfaces, protection, synchronization and acceptance
AC-coupled routePV and battery generally connect through separate AC conversion paths.Existing inverter, switchgear, controls and conversion path
DC-coupled routePV and battery generally share a DC-side architecture before conversion.Voltage windows, DC/DC controls, inverter loading and responsibility
Site delivery boundaryBattery, PCS, EMS, HVAC, fire strategy, installation and commissioning.Included equipment, responsible party, documents and exclusions

Project review

Scope the operating modes before selecting equipment.

Record the assumptions and use current documents for the selected model and supply scope.

  1. 01Set the primary objective
  2. 02Collect PV and load curves
  3. 03Define kW, kWh and reserve
  4. 04Map grid and backup modes
  5. 05Assign subsystem responsibility
  6. 06Compare proposals on one basis

Scope and limits

Coupling architecture does not establish product compatibility.

AC- and DC-coupled descriptions are general system concepts. The selected PV inverter, PCS, battery, BMS, EMS, protection and grid-connection requirements must be checked together. This page does not claim an SES project, delivered configuration or guaranteed outcome.

Solar + storage RFQ checklist

  • Project location and grid/utility context
  • Primary and secondary operating objectives
  • PV DC/AC rating and generation profile
  • Site interval load and operating schedule
  • Critical backup loads, peak/start demand and runtime
  • Target power and usable energy, if defined
  • Export/import constraints and tariff basis
  • Existing PV inverter and switchgear
  • Preferred PCS/inverter and EMS status
  • Grid-connected, islanded and off-grid modes
  • Generator or other source integration
  • Indoor/outdoor space, temperature and access
  • Battery, PCS, EMS, HVAC and fire-scope boundary
  • Required drawings, protocols and destination documents
  • Installation, commissioning and acceptance responsibility
  • Quantity, schedule and expansion plan
  • ILLUSTRATIVE EXAMPLE

    Commercial PV self-consumption with critical-load backup

    The buyer supplies a one-year PV profile and site interval load, identifies critical loads and states that backup reserve takes priority over peak reduction. This is a hypothetical framework, not an SES system design or case study.

    OPEN ITEMS
    • Define how much energy remains reserved for backup
    • Confirm transfer and islanding requirements
    • Check whether the existing inverter can participate
    • Assign EMS and protection responsibility
    • State commissioning and acceptance documents

    Related products and guides

    Review the applicable product, evidence or RFQ page.

    Choose the link that matches the product level or project information you need.

    Project FAQ

    Details to confirm before selection.

    Can PV size alone determine battery capacity?

    No. Load timing, objective, grid constraints, usable energy, reserve and control strategy are also required.

    Does an existing solar inverter work with any battery?

    No. Check the architecture, voltage, PCS/inverter functions, BMS/EMS communication, protection and vendor documentation.

    Can one battery serve self-consumption and backup?

    Potentially, but reserve and dispatch priorities must be explicit so the same energy is not committed twice.

    Is AC coupling better than DC coupling?

    There is no universal answer. Existing equipment, conversion paths, controls, expansion, site work and project responsibility affect the choice.

    Prepare a solar + storage project brief.

    Send the PV and load curves, objective, target power and energy, backup loads, grid mode, equipment status and delivery boundary.

    Start Technical RFQ ↗