Battery and ESS Application Intake Worksheet

Use this printable checklist to prepare a Technical RFQ. Record known values and mark unknown items “to be confirmed” rather than estimating a product specification from a chemistry description.

A · Project and duty

Identify what must be powered and when.

Record company/project, country, installation location, application, deployment timing and requested supply level. Describe operating schedule, critical load, autonomy or duration, response time, events per day or week, and recharge source/window.

  • Project and installation location
  • Cell / module / pack / rack / complete ESS scope
  • Operating objective and critical equipment
  • Duty profile, autonomy and response
  • Cycles or events and recharge window
  • B · Electrical and controls

    Keep energy, power, voltage and current separate.

    Provide the nominal architecture and permitted voltage range, continuous and peak power/current with duration, required usable energy, charger/rectifier/PCS/inverter model, connector and protocol requirements, and the single-line diagram where available.

  • DC bus or AC architecture
  • Voltage window and cutoffs
  • Continuous and peak current or power
  • Usable energy and autonomy basis
  • BMS/charger/PCS/EMS interfaces
  • C · Environment and mechanics

    Describe where the battery actually operates.

    Separate ambient from measured battery temperature. Include soak duration, indoor/outdoor exposure, humidity, dust, corrosion, altitude, available dimensions, access route, mass or centre-of-gravity limits, enclosure and thermal constraints.

  • Ambient and battery temperature profiles
  • Cold/hot soak and shutdown sequence
  • Ingress, condensation and corrosive exposure
  • Dimensions, mounting, access and mass
  • Thermal management and auxiliary-power limits
  • D · Evidence and ownership

    Match documents to the offered level and configuration.

    Request current datasheets, limits, drawings, interface files, test reports, certificates or declarations with scope, transport summary where required, O&M instructions, warranty/service and change control. Assign each open interface to the supplier, OEM, integrator, installer, owner/operator or authority.

  • Manufacturer, model, revision and configuration match
  • Standard edition, issuer, scope and limitations
  • Cell evidence does not automatically cover a pack or ESS
  • Transport evidence does not approve installation
  • Name an owner and due date for every open item
  • Buyer reference

    Use the same definitions and evidence boundary.

    Where a current value is absent, record Not provided / request current model revision. Do not replace it with a chemistry-wide estimate.

    Worksheet fieldBuyer entryConfirmation owner
    Application / equipment / operating objective____________________________Owner / operator
    Voltage range; continuous and peak current/power____________________________OEM / electrical engineer
    Usable energy, autonomy and duty profile____________________________System designer
    Charger, rectifier, PCS, inverter or EMS____________________________Integrator / equipment supplier
    Environment, soak and measured battery temperature____________________________Site owner / test engineer
    Dimensions, mounting, mass and access____________________________Mechanical / vehicle OEM
    Exact-model documents required____________________________Battery supplier
    Installation, commissioning and maintenance scope____________________________EPC / integrator / operator
    Unknowns and required decision date____________________________Named action owner

    Related products and evidence

    Use the information that matches the product level.

    Review the relevant product, test evidence, integration guide or RFQ page.

    SOURCES · REVIEWED 2026-11-14

    General technical references—not product evidence.

    Reviews summarize research across multiple materials and test designs. They do not establish a commercial cell, pack or ESS specification.

    Technical FAQ

    Product claims, conditions and supporting documents.

    Must every field be complete before contacting SES?

    No. Send known values and mark the rest to be confirmed. The worksheet makes the gaps visible.

    Can one certificate cover a cell, module, pack and ESS?

    Not automatically. Confirm the model, configuration, scope, issuer, edition and limitations.

    Is this worksheet a design approval?

    No. It organizes project inputs; qualified parties still approve equipment, integration and local compliance.

    How can I keep a copy?

    Use the browser print command to print the page or save it as PDF. No form is submitted from this worksheet.

    Send the completed project boundary—not a chemistry headline.

    Attach or copy the known worksheet fields into the Technical RFQ. Unknown fields can remain open for engineering confirmation.