Define the DC load, operating voltage, rectifier, outage duty, redundancy, cabinet and remote-monitoring boundary before selecting a battery string or module.

Decision framework

Translate the site duty into a battery and DC-system review.

Use measured or documented load information where possible. Multi-site and unattended projects also need a repeatable configuration, alarm plan and service boundary.

RequirementWhat to verifyEvidence to request
Battery chemistry and modelConfirm whether the offered sodium-ion, LiFePO4 or other model fits the complete voltage, power, recharge and site boundary.Exact-model datasheet, approved operating limits and quoted configuration
DC bus and voltage windowNormal, minimum and maximum bus voltage; equipment cutoff; string or module configuration.ICT equipment input range, battery limits and DC-system settings
Rectifier / chargerCharge profile, current sharing, recharge time, temperature compensation and restart behavior.Rectifier manual, firmware/configuration record and battery charging limits
Site loadContinuous demand, radio/transmission peaks, auxiliary loads and future growth.Load log or equipment schedule with peak duration
Backup dutyRequired runtime, outage frequency, reserve policy and allowed depth of discharge.Documented autonomy basis and acceptance method
RedundancyNumber of strings/modules, failure tolerance, isolation and maintenance method.Single-line diagram and protection arrangement
Cabinet and environmentIndoor/outdoor location, temperature, ventilation, access, shelf load and cable path.Cabinet drawing, environmental limits and installation instructions
Protection and wiringFuse/breaker coordination, conductor size, disconnects, grounding and fault boundary.Protection schedule and approved wiring diagram
Monitoring and serviceVoltage, current, temperature, SOC/alarms, protocol, service interval and remote access.Alarm list, protocol document and maintenance responsibility
ResponsibilitiesAssign DC-system design, battery approval, settings, commissioning, alarms, firmware, field replacement and maintenance.Responsibility matrix signed off by supplier, integrator and site owner

Project review

Review autonomy, recharge and maintenance as one operating case.

Record the assumptions and use current documents for the selected model and supply scope.

  1. 01Document the DC bus
  2. 02Measure the site load
  3. 03Set runtime and reserve
  4. 04Review rectifier settings
  5. 05Map cabinet and protection
  6. 06Confirm alarms and service

Scope and limits

Telecom sites with the same −48 V label can require different battery solutions.

This guide does not claim an SES deployment, installed base, stock position, fixed backup time or sodium-ion compatibility with a rectifier. The selected model, string arrangement, runtime and documents remain site- and project-specific. IEC 62619:2022 and IEC 63056:2020 have lithium-cell and battery scope and are not sodium-ion approvals. UN subsection 38.3 is transport evidence, not telecom-site approval.

Telecom battery RFQ checklist

  • Site type and number of locations
  • DC bus nominal/minimum/maximum voltage
  • Rectifier or DC power-system make and model
  • Continuous, peak and future load
  • Peak duration and auxiliary loads
  • Required autonomy and reserve policy
  • Outage history and recharge window
  • String/module redundancy and maintenance method
  • Indoor/outdoor cabinet and dimensions
  • Minimum/maximum site and battery temperature
  • Cable, terminal, fuse, breaker and disconnect details
  • Alarm points, CAN/RS485/SNMP or discrete I/O requirements
  • Destination and required documents
  • Quantity, rollout stage and service responsibility
  • ILLUSTRATIVE EXAMPLE

    Unattended outdoor radio site

    The buyer supplies a rectifier model, DC range, load log, required autonomy, cabinet drawing and alarm list. The example defines the review method only; it is not an SES installation record.

    OPEN ITEMS
    • Confirm recharge current after an outage
    • Separate radio peaks from continuous load
    • Check cabinet temperature rather than weather data alone
    • Define string isolation and replacement access
    • Confirm alarm protocol and responsible service party

    Related products and guides

    Review the applicable product, evidence or RFQ page.

    Choose the link that matches the product level or project information you need.

    Project FAQ

    Details to confirm before selection.

    Can two −48 V batteries be treated as interchangeable?

    No. Compare the complete operating window, current, rectifier settings, protection, communication, dimensions and evidence for the exact products.

    How should telecom backup time be calculated?

    Use the site load and discharge basis for the selected battery, then include reserve, temperature, aging and the agreed acceptance method.

    Does a CAN or RS485 port prove compatibility?

    No. Connector, physical layer, protocol, messages and host support must all match.

    What changes for many unattended sites?

    Configuration control, alarm handling, environmental exposure, transport, replacement access and service responsibility become part of the procurement scope.

    Prepare a telecom backup review.

    Send the DC bus, rectifier, load, runtime, redundancy, cabinet, temperature, alarm and rollout requirements.